News & Media

Completion of Civil Works at Perugia

Civil works began on December 3rd, 2020 at the Perugia Pilot. At that time, partner IDSGEORADAR performed a ground-penetrating radar measurements survey. Meanwhile, partner R2M operated UAV flights with and without a thermal camera. And all throughout the drilling phase, partner UNIPG completed the Structural Health Monitoring (SHM). After one

Read More

On Wednesday and Thursday 4th & 5th November, We Held Our GA#6!

The GEOFIT consortium successfully held our 6th General Assembly (GA) on November 4th and 5th, 2020, hosted remotely by R2M Solution. Important progress has been carried concerning the design of the GEOFIT systems to be installed in each of our five pilots. And although we are facing some delays during

Read More

The GEOBIM Platform

In the GEOFIT project, heating and cooling components design and integration are developed for the different layouts and demo-sites and comprise a detailed design and description of the different subsystems or components to form a complete system. Key elements and components, as well as their specifications, are being developed and

Read More

Ground Penetrating Radar Analysis at Perugia

On the 6th of October, IDS GeoRadar was at the pilot in Perugia to perform a Ground Penetrating Radar (GPR) survey over the area where excavation works will be executed.  Nowadays, GPR is commonly used to detect both metallic and nonmetallic underground objects, as well as providing 3D location, reporting depth, and “X,Y” location.   However, this technology has

Read More

GEOFIT at Sustainable Places 2020

On Day 3 of the 4-day virtual Sustainable Places 2020 (SP2020) conference, Thursday 29th October from 14.00 – 17.00 CET, Marco Calderoni from GEOFIT contributed to the “Renewable Heating and Cooling Solutions for Buildings and Industry Workshop”, and the presentations and video recordings are publicly accessible. The workshop brought together

Read More

Geothermal Catchment Field Completed at the Sant Cugat Pilot

We have finished the geothermal catchment field in Pins del Vallès School in Sant Cugat, one of our five Geofit pilots. It consists of twelve 120 m deep vertical boreholes and one horizontal directional drilling. Works carried out during the month of August include, on the one hand, drilling, installation

Read More

SIART and IDSGEORADAR Perform Structural Monitoring at Sant Cugat Pilot

From 27th to 31st July, SIART and IDSGEORADAR were at Sant Cugat pilot for structural monitoring, during the same week drilling works started. The goal was to perform structural monitoring before and during drilling, and see any impact in the school buildings. IDSGEORADAR installed a Hydra-G system which monitored real-time

Read More

Drilling Works Have Started at the Sant Cugat Pilot Site

On 31st July, Catalana De Perforacions (CDP) started the drilling works at the Sant Cugat demo site. The design of the geothermal field consists of 12 boreholes up to 120m deep and one Horizontal Directional Drilling (HDD). Image 1: location of the 12 boreholes. While drilling the first well, some

Read More

GEOFIT: Stakeholders and Markets, a Commercial Approach

The stakeholders in a building retrofit project often are unfamiliar with shallow geothermal energy (SGE) technology and potentially have conflicting requirements [MUSE, 2019]. The following table shows the influence and interest of (in)directly involved stakeholders of typical SGE for building retrofit projects, in the framework of suggested management principles. Building

Read More

Fourth Assembly in Bordeaux

Bienvenue a Bordeaux! The most elegant city in France! Last week we were at the Geofit 4th General Assembly where we had the chance to share all the advances achieved since the last meeting. We managed to get into intense planning and discussing agenda, mostly related to very important issues

Read More