Implementation of the Pre-retrofit Data Monitoring

By Adriaan Brebels, i.LECO NV, Belgium

For the different demo sites in the Geofit project a one-year pre-retrofit data-monitoring plan has been implemented. The data to be collected comes from different instruments and different sources.

Fig 1: Current model of energy usage. The current energy usage of heat and electricity is to take it from the net when you need it.

Locally, we measure the internal and external climate parameters (temperature, humidity, CO2, wind speed…) and energy consumption (heat and electricity) for the different participating buildings. Specific for the parts of the building that will be covered for heat by the heat pump, the additional installation of a heat meter will provide the time series for the heating profiles.

The local conditions are measured by weather stations as by IoT devices from Netatmo, or from weather stations and internal sensors that were already in place. The data from the different energy meters and internal sensors are collected by the local Building Management Systems or directly from the energy meters by a gateway.

Beside the local data, also the data from the weather forecast for the sites are synchronized into the IoT platform ‘EcoSCADA’ (Ecology/Economy Supervisory Control and Data Acquisition) of I.LECO. This makes it possible to have online dashboards and reporting besides the possibility to retrieve the data by a fast API.

Fig 2: Functionalities of the IoT platform EcoSCADA

Based on all this collected data the best dimensioning of the heat pumps can be defined and additional investments can be advised for local production (as solar panels) and local storage (as chemical batteries or hot water)

This time-series provide insight into consumption anomalies (for instance because the building uses too much energy during nights, weekends and holidays) what can result in energy savings after the retrofit.

Additionally – also due to the heat pumps – there will be more time flexibility for the load in the energy sources (for instance by pre-heating or lowering ventilation when the CO2 is still low enough).

All this will prepare a control strategy for the multi-component energy system. This control system needs to optimize the energy flow between the different components. This is done using forecast technology (for local consumption and local production) and markets’ knowledge (as the price of electricity). Other consumers out of the energy community can use the electricity. Energy providers can base the billing on blockchain technology instead of the classing billing.

Fig.3 : Multi-component energy system. The optimization of the usage of the different sub-components can avoid peaks and can contribute to the net stabilization.

 

Progress on Demonstration Activities

by Gisela Soley, from COMSA

The enhanced geothermal systems that are being developed under the GEOFIT project will be installed in 5 pilots located in 4 different countries covering the following scenarios: urban retrofitting, rock drilling and seismic retrofitting.

Since the start of the project, demo sites’ owners have been providing information to the technical partners in order to start the development of the most appropriate designs in terms of energy efficiency and integration within the existing building. Good understanding of the current situation is mandatory and following the IDDS (Integrated Design and Delivery Solutions) methodology through workshops with local stakeholders and partners involved and monthly calls has allowed determining the type of drilling (vertical, horizontal or excavation) and ground heat exchangers, and type of heat pump (electrically-driven developed by OCHSNER or hybrid developed by FAHRENHEIT) to be installed, as well as proposing innovative heating and cooling distributions systems for the different scenarios.

Below are detailed some of the technologies that have already been agreed in three of the pilots and also explained the constraints encountered up to now in the other two.

Pins del Vallès School in Sant Cugat (ES). The power needed is about 100 kW, so it has been estimated that 19 boreholes of 120 m deep are required. Besides improved vertical drilling, Horizontal Directional Drilling (HDD) will be performed (several alternatives have been analysed by CDP as shown in the picture below). The heat pump is being developed by OCHSNER and technical specifications and tests are being carried out in AIT labs. In principle, the heat pump will be used for heating 3 buildings (administrative, primary school and sports pavilion) and passive cooling has been proposed for the administrative one.

Sant’Appollinare offices in Perugia (IT). The office building for demonstration activities is placed in the Sant’Appollinare Medieval Fortress and its heating and cooling demand are about 16kW and 6kW respectively. As the loads are not very high it has been considered a good pilot to install horizontal ground heat exchangers and optionally, coiled slinky ones, and a hybrid configuration for the heat pump that is being developed by FAHRENHEIT and tested in CNR ITAE labs. This building has floor heating as heating distribution system and it has been proposed to refrigerate the offices by free-cooling.

Kingfisher swimming pool in Galway (IE). In this building there is CHP and two gas boilers. The two gas boilers cover the heating demand during the night; so apparently, the best solution will be to replace these two boilers by the ground source heat pump. This pilot is still under decision with regards to number of boreholes needed and capacity of the heat pump, but it has been agreed that improved vertical drilling will be performed and that OCHSNER will manufacture an electrically-driven heat pump as heating demand is quite high.

University building in Bordeaux (FR). In the last weeks, a new building on the ENSAM campus in Talence has been proposed after facing some technical and administrative constraints with the initial Nobatek office building demo site. The new building is being under study by the partners involved to see if it is suitable for shallow heat exchangers and for a hybrid heat pump system. The Consortium expects to have a clear picture of this pilot in the next general assembly taking place in May.

Residential building in Aran Islands (IE). After the visit in Aran last January, where eight different houses were surveyed, the Consortium has to come to a decision concerning which house(s) will be selected for demonstration activities according to the heating systems installed, emitters, existing passive measures if any, drilling space, accessibility and internet connection. CFO is in contact with the householders in order to get their approval. What it is clear is that retrofitting measures (external insulation and low temperature heating system) must be considered in order to improve the thermal comfort as well as to ensure the efficiency of the geothermal system to be installed. In addition, it is being analyzed that the final retrofitting and geothermal system proposed have the broadest range of applicability in the Aran Islands.

In parallel, monitoring plan for each demo building is being elaborated in order to establish the baseline which will allow comparing and assessing the performance of the building before and after renovation. While weather stations are now operational in Sant Cugat in order to monitor indoor/outdoor conditions, we are pending of their installation in Galway and Perugia. Next step is to install heat and electricity meters so that the 1-year pre-intervention monitoring period can start in these three pilots. Once Bordeaux and Aran pilots are clearly determined, the team will proceed with the monitoring tasks.

 

Thermally Driven Heat Pump Development and Testing

By CNR – ITAE

Within GEOFIT project, a novel heat pump will be developed, able to efficiently exploit geothermal energy to provide heat under several climates and conditions. To this aim, a hybrid configuration for a reversible heat pump is being developed: it consists in the coupling of a gas-driven adsorption cycle with a vapour compression cycle. In this way, the temperature lift on the vapour compression cycle that is commonly employed is reduced and the energy consumption of the component is lower. The proposed solution, that is modular and based on commercial components, is suitable for both new installations and retrofitting applications, allowing a high flexibility.

Read more

Geofit Presentation Video

Here is the first video of Geofit, a video that presents the project and launches, with its premiere, the Geofit video series, which will include interviews, updates on demo sites, and will last until the end of the project.

This video presentation of motion graphics explains the context from which the European project Geofit arises: the environmental problem and the barriers and difficulties it faces, as well as the effective and integral solutions provided by the project to overcome them. It also describes the characteristics of our geothermal retrofitting systems and our innovative tools, methods and technologies.

Finally, the video presents the pilot sites where the Geofit systems will be installed to demonstrate the results and all the countries that make up our consortium.

The video is uploaded to Geofit’s YouTube channel, so that everyone can share and help us spread the word about it!

Remember that very soon our first newsletter will be published, with more news.
Don’t forget to subscribe here!

New Stakeholder Workshop in Austria – 8 May 2019

Stakeholder workshop
Geothermal Energy and Ground Source Heat Pumps In Austria:
‘The Geofit solution’

Join us for an open panel discussion on the status of geothermal energy in context with ground source heat pumps and how the GEOFIT project is using the latest geo technologies for energy and cost efficient building retrofitting.

  • Date: Wednesday 8th May 2019
  • Time: 17:00 – 18:30 Uhr
  • Venue: Giefinggasse 2, 1210 Vienna

Contact: michael.lauermann@ait.ac.at

New Public Deliverable: “Geothermal – IDM for Drilling Processes”

GEOTHERMAL IDM FOR DRILLING PROCESS

(DRILLING WORKS – MODELLING AND VIRTUALIZATION – GEOTHERMAL BIM INTEGRATION VISUALIZATION, MONITORING AND LIFE CYCLE CONTROL)

Deliverable by IDP

GEOFIT project creates the perfect interaction environment bringing together a set of different disciplines, technologies, knowledge and innovation. One of the main achievements of the project is to create a seven-dimension BIM model covering different aspects like design, planning, programming, installation and deployment, monitoring, simulating, and life cycle and costs management of a building geothermal retrofitting project.

Read more

Control Solutions for Air-conditioning, Refrigeration and Heating & Energy Efficiency

Control solutions for air-conditioning, refrigeration and heating & energy efficiency

Article by Raul Simonetti from CAREL

From a control point of view, the energy efficiency opportunities can be grouped into three approaches:
1. Product-level approach
2. System-level approach
3. Supervision and IoT

Read more

Meet the Pilots: Aran Islands

BY AVRIL NÍ SHEARCAIGH

The Aran Islands pilot site in this project is located on Árainn, the largest of the three Aran Islands on the west coast of Ireland. This pilot’s focus is based on residential buildings. The Killeaney Cottages, pictured below, were selected and invited to participate. Eight of the households here are interested in taking part in GEOFIT and having their current heating system replaced by a Geothermal heat pump.

Read more

GEOFIT WORKSHOPS: Galway & Aran Islands

At the end of January we held two workshops in Ireland linked to two of our pilot sites, one located in Galway and the other in the Aran Islands. These pilot sites have different characteristics and represent different challenges for the demonstration of our project. In this post we will talk about the development of the workshops, as well as these two pilot sites, so that they can be better known.

Read more