Relevant for Scenario 1 and 2 (Urban retrofitting and Rock drilling)

 

  • Location: Galway, (Ireland)
  • Typology and use: Tertiary, Large sports facility
  • Climate condition: Northern
  • Relevant Installation: CHP unit of 50kWe/250kWth; 2x condensing boilers each 5000kWth;
  • Geological data: Rock bed in the near the surface (1 m)
  • Drilling technique used: Combination of HDD and improved vertical drilling
  • Main system to be installed: Electrically driven system, BEMS, HTC
  • Manager: NUIG
  • Main Industrial Partners Involved in the demonstration: R2M, COMSA, IDP